Recent Posts

Pages: [1] 2 3 ... 10
1
Hot Topics / Re: Utility Outages (elec-gas-cable-etc)
« Last post by Wrightwood on Yesterday at 07:18:35 AM »
SCE: Outage 000800537808 We estimate that power surrounding LINNET RD will be restored 06/08/2026 by 11:30am
2
Hot Topics / Re: Utility Outages (elec-gas-cable-etc)
« Last post by Wrightwood on Yesterday at 07:14:35 AM »
SCE: An unexpected power outage has occurred on 06/08/2026 at 6:33am in your area; outage #000800537808,
3
Hot Topics / Re: Road Condition News (discussion)
« Last post by Wrightwood on Jun 03, 26, 10:50:49 AM »
 Incident: 0030 Type: Report of Fire Location: N Cajon Blvd / Swarthout Canyon Rd Loc Desc: NB Lat/Lon: 34.275219 -117.451503
Detail Information
10:07 AM   22   [50] ** 75-152 CAJON FRM CLEGHORN TO KENWOOD AND COMMAND POST AT SWARTHOUT CANYON WILL START A SIG FOR 2 HRS
9:35 AM   21   [49] 75-M1 1185 FRM SWARTHOUT CANYON [Shared]
8:56 AM   20   [40] [Rotation Request Comment] 1039 ROY AND DOTS 909-201-0060 **************
8:54 AM   19   [39] A75-152 BLK NISS - REQ 1185 - IN CLOSURE
5:25 AM   18   [31] [Appended, 05:31:33] [2] BRUSH FIRE NEAR TRAIN TRACKS - OFF FRWY .
3:52 AM   17   [27] 75-S4 COPIES ADV AS LONG AS THEY COPY THEY NEED CLEGHORN AND CAJON CLOSED [Shared]
3:50 AM   16   [26] [Notification] [CHP]-PER COMM CTR, CORDS ADVG THAT SWARTHOUT CNY IS ALREADY CLOSED AND LOST LAKES HAS NO ACCESS SO THERE IS NOT NEED TO CLOSE IT [Shared]
3:43 AM   15   [25] 1039 SBCC - CPS WILL ADV SBCORDS
3:41 AM   14   [24] 75-S4 ADV RD CLOSURE NEEDS TO BE SET CAJON BETWEEN CLEGHORN AND KENWOOD - AND CAJON/ SWARTHOUT AND LOST LAKES RD- NEG EFFECT TO FWY
3:11 AM   13   [23] SBCC VIA ICOMM: RD DEPT HAS BEEN REQ TO STAGE 138 / 15 [Shared]
3:03 AM   12   [22] SBCC CPS VIA ICOMM / IF NOT NEEDED FOR ROAD CLOSURE, THEY WONT PUT IN CALL [Shared]
3:01 AM   11   [21] [Notification] [CHP]-SBCC VIA ICOMM: REQ WHERE THEYRE NEEDED FOR ROAD CLOSURE [Shared]
2:59 AM   10   [20] PER 75-S4 HAZMAT TEAM EVALUATING - NEG CLOSURE AT THIS TIME [Shared]
2:16 AM   9   [16] 1039 SBSO - COMMAND POST WILL BE CAJON AND SWARTHOUT CYN [Shared]
2:11 AM   8   [15] [Notification] [CHP]-SBSO ADV THEY NEED CHP ASST FOR ROAD CLOSURES IN AREA / UNK DURATION / ADV SBSO WL NEED TO ALSO CALL CORDS FOR HARD CLOSURE [Shared]
1:53 AM   7   [13] LN 12 IS FM BNSF [Shared]
1:53 AM   6   [12] [Notification] [CHP]-THIS IS A LITHIUM CONTAINER THAT IS ON FIRE / UNK IF THEY WL NEED EVACUATIONS IN THE AREA CC IS ON SCENE / THIS IS CONSIDERED A HAZMAT ALSO / INFO ONLY [Shared]
1:31 AM   5   [10] [Appended, 01:31:48] [2] TRAIN FIRE
1:17 AM   4   [5] 1039 BNSF TO ASC IF THEIRS
1:17 AM   3   [4] CORR LINE 1: BOX TRAIN ON FIRE , RP SEES FLAMES
1:16 AM   2   [3] SEES FLAMES AND SMOKE
1:16 AM   1   [2] TRAIN STOPPED / BOXES ON FIRE ON WB SIDE
Unit Information
8:54 AM   29   Unit At Scene
4
Hot Topics / Re: Utility Outages (elec-gas-cable-etc)
« Last post by Wrightwood on Jun 02, 26, 09:13:56 AM »
An outage is scheduled for 6/03/2026 1:00 AM – 6/03/2026 6:00 AM to replace equipment. This project is intended to preserve public safety and ensure long-term reliability in your community.
5
Hot Topics / Re: Tri-Community Green Waste Recycling Days
« Last post by Wrightwood on May 30, 26, 04:18:48 PM »
RECORD SETTING DAY at the pine needle and green waste collection event today.
289 vehicle loads of waste was dropped off today. That filled 10 forty yard bins.
This is the largest single day drop off number in the event’s history which started in 2007.
 
Keep up the good work Wrightwood. This event will continue tomorrow from 9am until 3pm.
Get your yards cleaned up before the County starts property inspections on June 1st.
6
Hot Topics / Re: Utility Outages (elec-gas-cable-etc)
« Last post by lwt42 on May 30, 26, 12:44:13 PM »
Nothing happened here.
7
Hot Topics / Re: Utility Outages (elec-gas-cable-etc)
« Last post by Wrightwood on May 28, 26, 07:38:31 PM »
Good Afternoon Wrightwood Community Leaders:
Sharing a friendly reminder the grid hardening work originally scheduled to take place from 5/12-5/19 was rescheduled to 5/29-6/3. The planned work remains the same and will now also bundle the replacement of a pole damaged by a car accident on 5/10 in Phelan that impacted a circuit feeder into Wrightwood. 

SCE customers are only expected to experience two outages related to this work: The first on 5/29/26 from 1AM – 6AM as customers are transitioned from circuit power to generator power. These customers will remain on backup generation during the work. The second outage will be on 6/3/26 from 1AM – 6AM as SCE customers are transitioned from backup generator power to normal circuit power. Customers have received appropriate notifications as described below:

    Planned outage on 05/29 at 0100-0600: Initial notification was sent to customers on 05/15/26 via digital channels (email, voice message and/or text)
    Planned outage on 06/03 at 0100-0600: Initial notification was sent to customers on 05/22/26 via digital channels (email, voice message and/or text)

Thank you,
Carina Cabrera
Government Relations Manager
8
Hot Topics / Re: Utility Outages (elec-gas-cable-etc)
« Last post by Wrightwood on May 28, 26, 05:26:38 PM »
Next outage 5/29/26     1am - 6am
9
Hot Topics / Tri-Community Green Waste Recycling Days
« Last post by Wrightwood on May 27, 26, 11:03:31 AM »
Wrightwood to Host Tri-Community Green Waste Recycling Days This Weekend

The Tri-Community Green Waste Recycling Days will return to Wrightwood from 9 a.m. to 3 p.m. Friday through Sunday, May 29-31, offering residents a free opportunity to prepare for wildfire season. The event will take place at 1450 Highway 2, across from the Wrightwood Fire Station, and is aimed at helping the community reduce fire risks by properly disposing of green waste.

Accepted materials include pine needles and cones, weeds and grass, as well as branches and tree trimmings, with limbs limited to a maximum diameter of 10 inches. Pine needles do not need to be bagged. Items not accepted include rocks, dirt, trash, Joshua trees, palms, stumps, roots and lumber.

For safety, smoking is prohibited on-site, trailers are limited to a maximum length of 20 feet, and all loads must be covered and secured with a tarp during transport, as required by law.

10
Hot Topics / Re: Utility Outages (elec-gas-cable-etc)
« Last post by lwt42 on May 23, 26, 03:09:39 PM »
SCE: Maintenance power outage #000800532410 is scheduled from 06/03/2026 at 1:00am to 06/03/2026 at 6:00am. Prep w/backup plan. Info:  https://wbx.sce.com/B94Cab
Pages: [1] 2 3 ... 10