Incident:  02580   Type:    Traffic Hazard   Location:   La002787 Angeles Crest Hwy / Wo Big Pines Hwy  Loc Desc:  LA002787 ANGELES CREST HWY / WO BIG PINES HWY    Lat/Lon:  34.378539 -117.704256   
Detail Information
7:31 PM   6   [18] B89-040B THERE ALSO 3 VEHS STILL AT VINCENT GULCH CAMP P/LOT // WILL BE NOTIFYING THE CT SUP THEY'RE STILL THERE
6:36 PM   5   [16] B89-040B CT SUPERVISOR WILL BE 97 // WILL BE SHUTTING DWN THE GATE / SR2 WILL BE CLOSED FRM SR39 AT GRASSY HALLOW FOR UNK DURATION
5:38 PM   4   [12] PER 89-40B 1097 NOW
5:36 PM   3   [9] [Notification] [CHP]-CHIEF IS HERE FM ANGELES FOREST REQ AN ETA PLS [Shared]
4:39 PM   2   [4] [Appended, 16:44:51] [1] POT- HOLE THE SIZE OF A MAN HOLE COVER IN MIDDLE LNS
4:27 PM   1   [2] GOOD SAMARITAN IN LANES SLOWING TRFC DOWN SO THEY WILL NOT HIT
Unit Information
4:27 PM   2   Unit Assigned
5:38 PM   1   Unit At Scene
Wrightwood Forum is the first & most dependable local social media outlet

Offline Nolena

  • Moderator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #1 on: Jun 07, 17, 08:31:13 PM »
Hmmmm..... I have hikers who will need updates on this. Some have relatives who want to drive out Highway 2 to meet their hikers.

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #2 on: Jun 08, 17, 08:42:21 PM »
Facebook
US Forest Service - Angeles NF and San Gabriel Mtns. National Monument

Angeles Crest Highway, Hwy 2, is closed just West of the Big Pines VIS between Grassy Hollow and Islip Saddle due to a large sink hole that appeared in the road. CalTrans is still working on it. The cavern is larger underneath than the hole in the asphalt. (Photo courtesy of Ron Heinig, REC-31)


Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #3 on: Jun 09, 17, 07:26:32 AM »
Caltrans:
6/9/2017 7:17 AM
We are still in the process of getting a contractor on scene.

Offline Elk

  • Moderator
  • Raccoon
  • *****
  • Posts: 1559
  • Go PATS!
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #4 on: Jun 09, 17, 08:07:49 AM »
Caltrans:
6/9/2017 7:17 AM
We are still in the process of getting a contractor on scene.


Doesn't Caltrans have the ability to do repairs of this type without a contractor? Seems like they used to be able to handle something of this nature with their own crews.  ::)

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #5 on: Jun 09, 17, 09:28:42 AM »
Twitter
Caltrans District 7? Jun 8

Angeles Crest Hwy (SR-2) closed between Grassy Hollow & SR-39 for sink hole repairs for unknown duration, use alt. route


Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #6 on: Jun 09, 17, 10:29:34 AM »

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #7 on: Jun 09, 17, 02:36:02 PM »

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #8 on: Jun 09, 17, 04:46:57 PM »
Under the pavement is a large cavern (Thanks to Ron Heinig for the photo)


Offline Nolena

  • Moderator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #9 on: Jun 09, 17, 05:57:07 PM »
Amazing! Exactly where is this?

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #10 on: Jun 09, 17, 07:20:48 PM »
Just West of Grassy Hollow (walking distance)

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #11 on: Jun 23, 17, 11:31:54 AM »

Offline Bob C

  • Moderator
  • Raccoon
  • *****
  • Posts: 942
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #12 on: Jun 23, 17, 11:41:31 AM »
Sheesh... tell me this isn't a government operation.

And God help us if a Bighorn Sheep falls into the hole.. knowing them, they'll proclaim the hole to be "protected area" now, and it'll never get fixed.

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #13 on: Jun 23, 17, 02:52:23 PM »
Jun 23, 2017 2:37pm
From Caltrans
Media Relations and Public Affairs

I just heard that the eastern closure limit has been moved west to Vincent Gulch postmile 74.7

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #14 on: Jul 21, 17, 01:10:30 PM »
7/21/2017 12:01 PM
From Caltrans
Media Relations and Public Affairs

We got environmental clearances. Just waiting for Construction to tell me when they start.

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #15 on: Jul 26, 17, 01:38:32 PM »
7/26/2017 1:33 PM
From Caltrans
Media Relations and Public Affairs

I'm hearing that the closure has moved back to Big Pines Road, so SR2 is closed between SR39 and Big Pines. I'm also hearing that it may open by 7/31. That's preliminary as I still haven't heard from our construction engineers...but I'm hopeful!

Our website states road is closed at Vincent Gulch which is 5.3 miles west of Big Pines (incorrect).  The road is actually closed at Grassy Hollow (pm 77.3) which is 2.6 miles from Big Pines.  The closed gate at Highway 39 is correct.

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #16 on: Jul 27, 17, 02:12:57 AM »
7/26/2017 9:45 PM
From Caltrans
Media Relations and Public Affairs

The plan now is to secure the road enough so we can open it to one way traffic control, which will be managed through flagged during the day and automated signals during the night. The goal is to get the road open by August 8.

Repairs will require extensive drain work, so it may be a month before the road is fully opened. At least you'll have access again.

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #17 on: Aug 05, 17, 12:20:49 PM »
8/5/2017 11:45 AM
From Caltrans
Media Relations and Public Affairs

Here's from the construction engineer:

We ran into a little snag in retaining an available automatic traffic system device and we've were delayed by two rain events this week. However, we have some contingencies that we are in acting to keep us on schedule we are working today to make up for the inefficiency caused by the weather, so we can open the road on Monday and we will utilize steel plates over the compromised area of the roadway, so the entire travelway can be in use during the non work hours (nights & holidays). While repair work continues during the work shift hours.

"Our plan remains the same we will open on Monday evening for through traffic, and allow traffic during the work shift utilizing flaggers and/or other acceptable safe measures."

Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #18 on: Aug 07, 17, 01:24:57 PM »
Facebook
Mike Worshum?
to Angeles Crest Highway
4 hrs

Heads up, Cal Trans has begun work on the sink hole near mile marker 75 which is near Wrightwood. They will be opening up to one lane during construction this week. During the weekend and night hours they will place steel plates over the construction to replace the culvert and repair the surface. Here is a direct quote from the Media Relations and Public Affairs office:

"We ran into a little snag in retaining an available automatic traffic system device and we've were delayed by two rain events this week. However, we have some contingencies that we are in acting to keep us on schedule we are working today to make up for the inefficiency caused by the weather, so we can open the road on Monday and we will utilize steel plates over the compromised area of the roadway, so the entire travelway can be in use during the non work hours (nights & holidays). While repair work continues during the work shift hours.

"Our plan remains the same we will open on Monday evening for through traffic, and allow traffic during the work shift utilizing flaggers and/or other acceptable safe measures."

I'm including a photo Shot by one of the volunteers at Grassy Hollow that overlooks the road Thanks Sabrina !


Offline Wrightwood

  • Administrator
  • Raccoon
  • *****
  • Posts: Plenty of Posts!
  • Wildlife Gateway
Re: Angeles Crest Hwy / Wo Big Pines Hwy SR2 WILL BE CLOSED
« Reply #19 on: Aug 07, 17, 01:34:38 PM »
8/7/2017 12:31 PM
From Caltrans
Media Relations and Public Affairs

The crews will be unable to open the road today (one day earlier) as the rains last week and a plant delay for the paving materials have caused snags. They are working hard to get the road open around noon tomorrow, which I believe the originally communicated opening date.

Remember that this is simply to support one lane so we can safely reopen the road to one way traffic control while the contractor works on the other lane. Work will continue for another month or so.

 