Note that the Park Drive project has been found exempt from CEQA due to 1. Park Drive is existing facilities and 2. it qualifies are replacement or reconstruction!
APPROVED (CONSENT CALENDAR) Motion/Second: Joe Baca, Jr./Curt Hagman AYE: Col. Paul Cook (Ret.), Jesse Armendarez, Dawn Rowe, Curt Hagman, Joe Baca Jr.
1. Find that the Park Drive and Other Roads Project in the Wrightwood Area is exempt under the California Environmental Quality Act Guidelines, Title 14 of the California Code of Regulations Section 15301(c) Class 1 (existing facilities) and Section 15302(c) Class 2 (replacement or reconstruction).
2. Approve the Park Drive and Other Roads Project in the Wrightwood Area as defined in the Notice of Exemption and direct the Clerk of the Board of Supervisors to file and post the Notice of Exemption. (Presenter: Brendon Biggs, Director, 387-7906)
-------- Forwarded Message --------
Subject: County of San Bernardino Board of Supervisors Meeting Agenda - 1/24/23
Date: Sat, 21 Jan 2023 00:59:47 +0000
From: San Bernardino County <sbcounty@public.govdelivery.com>
Reply-To: sbcounty@public.govdelivery.com
Categorical Exemption. State type and section: Class 1 Categorical Exemption Section 15301(c)
Existing Facilities and Class 2, 15302(c) Replacement or Reconstruction
Project Title: Park Dr and Other Roads Project (W.O.H15113)
Project Location: Work is planned for Park Dr from HWY 2
to Apple Ave; Apple Ave from Pine St to Cedar St;
Evergreen Rd from Pine St. to Cedar St. in the community
of Wrightwood in San Bernardino County. See Attachment
2 Location Exhibit.
Project Description: The San Bernardino County Public
Works Department proposes work that generally includes
pavement rehabilitation and reconstruction, new ADA
ramps, sidewalk, curb and gutter and a new concrete
drainage swale. Equipment planned for use on this project
will included but is not limited to: Tractor, asphalt paver,
backhoe, dump truck. No traffic detours or nighttime
construction are planned at this time. Minor relocation of
utilities is anticipated. Construction duration is anticipated
for approximately three (3)-months. County of San
Bernardino Development Code 83.01.80(g)(3): exempts
noise from temporary construction, maintenance, repair, or
demolition activities between 7:00 a.m. and 7:00 p.m.,